发表于 2023-7-11 11:34
来自手机
|显示全部楼层
此文章由 sydneymum 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 sydneymum 所有!转贴必须注明作者、出处和本声明,并保持内容完整
有没有邻居加高他们自己地面60cm,造成我家积水,council 说他们只要加高60cm以内,就符合规定。
Subdivision 15 Earthworks, retaining walls and structural support
2.30 Development standards
2.30 Development standards
The standards specified for that development are that the development must—
(a) not be a cut or fill of more than 600mm below or above ground level (existing), and
(b) be located at least 1m from each lot boundary, and
(c) if it is carried out, constructed or installed in a heritage conservation area or a draft heritage conservation area—be located in the rear yard, and
(d) be located at least 40m from a waterbody (natural), and
(e) not redirect the flow of any surface water or ground water or cause sediment to be transported onto an adjoining property, and
(f) if it is a retaining wall or structural support for excavation or fill, or a combination of both—
(i) be not be more than 600mm high, measured vertically from the base of the development to its uppermost portion, and
(ii) be separated from any retaining wall or other structural support on the site by at least 2m, measured horizontally, and
(iii) be located at least 1m from any registered easement, sewer main or water main, and
(iv) have adequate drainage lines connected to the existing stormwater drainage system for the site, and
(g) if the fill is more than 150mm deep—not occupy more than 25% of the area of the lot, and
(h) if the fill is imported to the site—be free of building and other demolition waste, and only contain virgin excavated natural material (VENM) as defined in Part 3 of Schedule 1 to the Protection of the Environment Operations Act 1997, and
(i) if the land is in a rural zone or an environmental zone—not be fill of more than 100 cubic metres on each lot.
|
|