[学习培训] 政府免费课程 Building and Construction 到底学什么?附课程大纲 [复制链接]

发表于 2020-8-11 23:22 |显示全部楼层
此文章由 cdfei 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 cdfei 所有!转贴必须注明作者、出处和本声明,并保持内容完整
学完这个就可以自己修房子了吗?
Advertisement
Advertisement

发表于 2020-8-12 00:04 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
WEEK 5

MONDAY  
Site supervision, administration and planning

本课程继上周学习到了各种CLAIM,这周继续Complete an insurance claim。
之后,讲了一个很重要的内容。Building in Victoria
包括了Planning permits and Building permits

需要注意的是,这个各个州的要求都不一样。

后面布置一个作业,看的我一口老血要吐出来。可惜权限太低,图发不上来。是写施工组织计划的Create a site establishment plan.





=======================================================

TUESDAY
codes and standards

今天主要讲了一个Assignment 2 Analyse and apply a range of solutions 作业
这个作业好难啊,因为不是客观选择题,除了写YES OR NO 还要写WHY
要根据图纸,查找规范。找出现阶段有哪些问题,解决措施。





发表于 2020-8-12 09:18 来自手机 |显示全部楼层
此文章由 viviancn 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 viviancn 所有!转贴必须注明作者、出处和本声明,并保持内容完整
这个是不是做builder要求的课程?

发表于 2020-8-12 21:54 |显示全部楼层
此文章由 NSW2019 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 NSW2019 所有!转贴必须注明作者、出处和本声明,并保持内容完整
楼主加油,我们正好看看当地的要求

发表于 2020-8-12 22:03 |显示全部楼层
此文章由 NSW2019 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 NSW2019 所有!转贴必须注明作者、出处和本声明,并保持内容完整
还是维州给力,新州这个没有政府资助

发表于 2020-8-12 22:05 |显示全部楼层
此文章由 NSW2019 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 NSW2019 所有!转贴必须注明作者、出处和本声明,并保持内容完整
看来疫情严重也有好处
Advertisement
Advertisement

发表于 2020-8-12 22:07 |显示全部楼层
此文章由 NSW2019 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 NSW2019 所有!转贴必须注明作者、出处和本声明,并保持内容完整
楼主如果一直坚持下去,我们这些看官也算是受维州政府资助免费学了一遍

发表于 2020-8-12 22:08 |显示全部楼层
此文章由 NSW2019 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 NSW2019 所有!转贴必须注明作者、出处和本声明,并保持内容完整
帮你顶一下

发表于 2020-8-13 12:00 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
cdfei 发表于 2020-8-11 22:22
学完这个就可以自己修房子了吗?

至少可以 owner builder。自家建房做个监工什么的吧!哈哈

发表于 2020-8-13 12:01 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
NSW2019 发表于 2020-8-12 21:08
帮你顶一下

谢谢大叔,看了您的帖子!也请加油哦!实在不行疫情过后就来VIC~~。

发表于 2020-8-13 12:06 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
NSW2019 发表于 2020-8-12 21:03
还是维州给力,新州这个没有政府资助

其实我想说,您不缺现场工程经验,英语也很好。至少比绝大多数人好了太多太多。目前就差一个机会了。我觉得您真的可以考虑一下维州。我看到很多TAFE招老师的。如果有些本地工作经验后,就业面就打开来了。
Advertisement
Advertisement

发表于 2020-8-13 12:07 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
fasonfocus88 发表于 2020-8-11 21:34
楼主真棒!过几个月我也要开始学了    希望可以一起努力呀

欢迎多来交流。

发表于 2020-8-13 16:41 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整

今天,来思考一下令人头秃的作业

走过路过,出出主意吧!

课程名称:CODES AND STANDARDS


Assignment 2 – Analyse and apply a range of solutions

Purpose of Assessment

Student is required to access, interpret and apply relevant building codes and standards applicable to the construction processes of residential and low rise commercial buildings (low rise' licensing classification with reference to Class 1 and 10 construction and Classes 2 to 9 And to access, interpret and apply relevant building codes and standards applicable to the construction processes of medium rise commercial and wide span buildings (medium rise licensing classification with reference to Classes 1 and 10 construction, Classes 2 and 3 to a maximum of 3 storeys, and Classes 4 to 9

Assignment 1  Task  
You are to reference the NCC / BCA and answer the following questions

Essential Resources
Building Code of Australia (BCA) Volumes 1 & 2 (National Construction Code).
Relevant Australian Standards
===================================
Analyse and apply a range of solutions to a construction problem for compliance with the BCA. Using  Section 3 of the BCA Volume 2 You are to check over the provided plan for compliance with DTS and provide a report for solutions to problems discovered.  Your report need only cover the area’s listed below. Soil Class is M, masonry veneer clad home, built over 30 years ago.

1. Reinforced strip footing system is what’s nominated on the plan adequate for a site Class M if not specify required size and reinforcement.     Explain your answer.




        

2. The plan does not show any fire protection or smoke alarm requirements, what is required if we assume that the house is a minimum 5 metres from all boundaries except the bedroom / bathroom wall which is a parallel set back of 700mm from it boundary.   Explain your answer.





        

3. The new owner has requested installation of an open brick fire place and brick chimney to the living room external wall, describe what is required to comply with DTS.  Explain your answer.

  


           

4. The new owner has requested installation of polished floor boards to the bathroom can this be done?   

Explain why or why not referring to NCC BCA Part 3.8   

5. The new owner has requested installation of and air conditioning system that requires ductwork install in the hall area against the ceiling up to the kitchen; this allows registers to enter all rooms off the hallway.  This requires the hall ceiling to be reduced in height, what is the minimum it can be reduce from its current height of 2400mm.   Explain your answer.



  


        

6. Does the current WC comply with the BCA Part 3.8.3?  or 3.8.5     Explain your answer.



  
        

7. The front and back doors access are about 500mm above the ground outside; do they require landings or handrails to be installed?   Explain your answer.




        

8.       Regarding W1 and natural lighting to the bathroom does the window comply? Explain your answer

===============以上是作业内容===============================

下面是图纸

CONSTRUCTION DETAILS Roof pitch 22o47’ Ridge: 175 x 38 F8 OBHW Rafters: 125 x 38 F8 OBHW @ 600 crs. Purlins & Props: 100 x 75 F8 OBHW Collar Ties: 75 x 38 F8 OBHW Ceiling Joists: 100 x 38 F8 OBHW @ 600 crs. Top & Bottom Plates: 100 x 50 F8 OBHW Studs: 100 x 38 F8 OBHW @ 600 crs. Floor Joists: 100 x 38 F8 OBHW @ 450 crs. Bearers: 100 x 75 F8 OBHW Stumps: 100 x 100 concrete seated in concrete pad of min. 350 φ x 150 deep. Concrete Footings: 300 x 300 deep reinf. With 2 layers of L11TM.


本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册

x

发表于 2020-8-13 16:46 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
申请加我好友的朋友们,我还是草鞋。要到布鞋才能加好友,所以很抱歉。请在一楼为我加分吧。谢谢!

发表于 2020-8-13 16:54 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
viviancn 发表于 2020-8-12 08:18
这个是不是做builder要求的课程?

是的。读完合格后可以拿四级证书

发表于 2020-8-13 17:06 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
山与风 发表于 2020-8-11 20:33
谢谢指教,改了以后,还是错了一个地方。。。。。

在第82楼,关于建筑物分级Classify Buildings Quiz的试题中错了一道,我发邮件问了老师,老师回复,Comments       
Hi you got A single residence in an office building incorrect it is not a class 5 have another look and send answer via email and if correct I will adjust your score
Advertisement
Advertisement

发表于 2020-8-13 19:22 |显示全部楼层
此文章由 fatty 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 fatty 所有!转贴必须注明作者、出处和本声明,并保持内容完整
本帖最后由 fatty 于 2020-8-13 18:30 编辑
山与风 发表于 2020-8-13 16:06
在第82楼,关于建筑物分级Classify Buildings Quiz的试题中错了一道,我发邮件问了老师,老师回复,Comme ...


class 4
老师给的解释不是最直观,你对照ncc的定义就更容易明白,关键词,single dwelling。

发表于 2020-8-15 17:26 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
fatty 发表于 2020-8-13 18:22
class 4
老师给的解释不是最直观,你对照ncc的定义就更容易明白,关键词,single dwelling。 ...

谢谢啦! 正解就是CLASS 4


https://www.qbcc.qld.gov.au/sites/default/files/BCA%20Classes%20of%20Building.pdf



Classes of Building
Class 1 Class 1a A single dwelling being a detached house, or one of a group of two or more attached
dwellings, each being a building, separated by a fire-resisting wall, including a row house,
terrace house, town house or villa unit.
Class 1b A boarding house, guest house, hostel or the like with a total area of all floors not exceeding
300m2, and where not more than 12 people reside, and is not located above or below another
dwelling or another Class of building other than a private garage.
Class 2 A building containing 2 or more sole-occupancy units each being a separate dwelling.
Class 3 A residential building, other than a Class 1 or 2 building, which is a common place of long term or transient
living for a number of unrelated persons. Example: boarding-house, hostel, backpackers accommodation or
residential part of a hotel, motel, school or detention centre.
Class 4 A dwelling in a building that is Class 5, 6, 7, 8 or 9 if it is the only dwelling in the building.
Class 5 An office building used for professional or commercial purposes, excluding buildings of Class 6, 7, 8 or 9.

发表于 2020-8-15 17:27 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
https://www.qbcc.qld.gov.au/sites/default/files/BCA%20Classes%20of%20Building.pdf


CLASSIFICATION SUMMARY OF BUILDINGS
AND STRUCTURES
This list provides the definitions of Building Classes as set out in the Building Code of Australia.

建筑分级参考以上表格

发表于 2020-8-15 19:09 |显示全部楼层
此文章由 fatty 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 fatty 所有!转贴必须注明作者、出处和本声明,并保持内容完整
山与风 发表于 2020-8-15 16:26
谢谢啦! 正解就是CLASS 4

很高兴可以帮到你

发表于 2020-8-16 00:40 |显示全部楼层
此文章由 山与风 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 山与风 所有!转贴必须注明作者、出处和本声明,并保持内容完整
本帖最后由 山与风 于 2020-8-18 22:46 编辑

贴一份作业~~~~如果有同胞选到我这门专业,也行能给到一些参考。

Estimating Assessment Task


Question 1
1 / 1 pts
Refer to the NCC 2019 Vol. 2, Section 3, Part 3.9.1, Clause 3.9.1.3

What is the maximum gradient of an external ramp serving an external doorway or a ramp within a building?

  1:8
  1:10
  1:12
  1:6

Question 2
1 / 1 pts
Refer to the NCC 2019 Vol 3, Section D, Part D1 Excessive Noise, Clause DP1.2

What must Plumbing and drainage systems be designed to reduce?

  the transmission of airborne and/or impact generated sound
  the water pressure in a basement
  the flow of stormwater through a 100mm pipe
  the transmission of odours

Question 3
1 / 1 pts
Standards Australia is the organisation that develops various Australian Standards.
SAI Global is the publisher that has an exclusive licence over the distribution and sale of Australian Standards.

Which of the following options would NOT be considered suitable?

  A copy offered on Gumtree
  Purchase via the official SAI Global website
  Purchase via the official Standards Australia website
  Through Swinburne Library’s student access to SAI Global

Question 4
1 / 1 pts
You are planning your upcoming project, which involves demolition of an existing dwelling, including some associated excavation works.

It is critically important to comply with the relevant codes of practice, standards and legislative requirements.

Compliance with which of the 4 following codes, standards or legislation would be most important?

  Safe Work Australia Demolition Work Model Code of Practice
  WorkSafe Vic. Compliance Code - Excavation
  AS 2601 - Demolition of Structures
  Building Act 1993 & Regulations 2018
  AS 3660 - Termite Management
  AS 3740 - Waterproofing
  Domestic Building Contracts Act 1995
  Electronic Appliances Code of Practice

Question 5
1 / 1 pts
Compliance with EPA requirements.

Building and construction sites create pollution, including different types of waste, noise and dust.

As a builder, you are responsible for the impact of your work on the health of people and the environment.

Which of the following are EPA issues? There are more than one.

  Airborne dust
  Noise
  Sediment run-off control
  Chemical spills

Question 6
1 / 1 pts
What are the two main categories of regulated building contracts in Victoria?



  Major Domestic Building Contract
  Cost Plus Contract
  Alterations and Additions Contract
  Outdoor Building Projects Contract
  Swimming Pool and Spa Contract
  Victorian Kitchen Bathroom & Laundry Supply Install Contract

Question 7
1 / 1 pts
Obtain prices from a local building materials supplier, or refer to the Student Guide, to answer the following.

You require 12 lineal metres (LM) of LVL 140 x 45

What is the total cost?

Do not enter $, commas, or decimal point.

Enter your answer in the following format: ie 96

190

Question 8
1 / 1 pts
Registering for WorkCover Insurance



When must you register for WorkCover Insurance?

Select two (2) appropriate answers



You may log in to https://www.worksafe.vic.gov.au/insurance to obtain the relevant information

  Generally, you must register for WorkCover insurance if you or your company employs any workers in Victoria.
  If your company employs you personally, then you are a worker of your own company, and need to register
  When you start a business
  If you’re a sole trader

Question 9
1 / 1 pts
Employee or Contractor?

Select the answer that best matches the description.

The worker can't subcontract/delegate the work, ie. they can't pay someone else to do the work

  Worker/Employee
  Contractor
  No answer text provided.
  No answer text provided.

Question 10
1 / 1 pts
Employee or Contractor?

Select the answer that best matches the description.

The worker takes commercial risks, with the worker being legally responsible for their work and liable for the cost of rectifying any defect in their work

  Contractor
  Worker/Employee
  No answer text provided.
  No answer text provided.

Question 11
1 / 1 pts
Employee or Contractor?

Select the answer that best matches the description.

The worker is not operating independently of your business. They work within and are considered part of your business.

  Worker/Employee
  Contractor
  No answer text provided.
  No answer text provided.

Question 12
Not yet graded / 1 pts
List two estimating software systems commonly used in the building and construction industry.
Your answer:
DateBuild

Buildertrend


Question 13
1 / 1 pts
Using the Provisional sum in the contract for Cooke Street ($13,194.00) and the information below, answer the following questions.

Scenario: You have carried out the slab works but due to an excess of soil excavated, soil contamination, increased tipping costs and deeper beam depth require the actual cost has increased to $15,300.00 inc GST.

What is the Difference in cost between the Actual Cost of the Concrete Slab and the Provisional Sum Allowance?

This is the difference to be paid by or due to, the Owner.

Do not use the $ sign, however, you must enter the amount, including cents, as this is a claim for payment from your Client.

For example: 2,345.00

2,106

Scenario - Variations (V)

The Client requests a Variation to the Contract Works.

They wish to install joinery (cabinets and benchtop) in the Laundry, along the wall between the Laundry and Kitchen.

The Drawings show a 45 litre trough cabinet on the plan, however, this is an excluded item in the Contract, and is being supplied and installed by the Client.

The cost of the Variation is only for the joinery; there is no deduction required for the trough.

The price of the joinery with benchtops, supplied and installed is $745.00/LM excl. GST

Task: Based on the above information answer the following questions.


Question 14
1 / 1 pts
Calculate the cost of the Variation for the Joinery EXCLUDING GST

Do not use $, comma (,) or decimal point (.)

Enter your answer as 1234

1,490

Question 15
1 / 1 pts
Calculate the cost of the Variation for the Joinery INCLUDING GST

Do not use $, comma (,) or decimal point (.)

Enter your answer as 1234

1,639

Question 16
1 / 1 pts
What is the GST amount in the Variation?

Do not use $, comma (,) or decimal point (.)

Enter your answer as 123



149

Question 17
Not yet graded / 1 pts
How should the variations be communicated and recorded on the plans to ensure that they are followed?
Your answer:
the builder cannot proceed with the work described in the variation until they receive signed consent from the client. The client is required to respond to the written notice of variation within five days, and claim for extension of time and money.


Question 18
Not yet graded / 1 pts
List two building project management software systems that could manage variations and client communications?
Your answer:
Procore

CoConstruct


Question 19
Not yet graded / 1 pts
You have been asked to supervise the work of another staff member. You have asked Kerry to estimate the brick work take off for the 68 Swinburne Rd job.

Task: Review the estimate Kerry created and identify any errors that were made when comparing with your calculations in Assessment Task 2.1. Write an email to Kerry explaining what was wrong and request that the estimate is rectified.

Kerry sent you the following email

Hi

I did the estimate for the bricks and found the following:

Number of bricks overall is 3,800 x .73c
Added 5% for wastage is $190
Total cost estimate for this job is $2964
Let me know what you think.

Thanks

Kerry




Question 20
1 / 1 pts
Kerry also wanted to include a clause in the contact that would allow for ‘rise and fall’ cost increase. Is this clause likely to be allowed in the contract?
  Yes
  No
Advertisement
Advertisement

发表于 2020-8-16 11:33 来自手机 |显示全部楼层
此文章由 yy0185 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 yy0185 所有!转贴必须注明作者、出处和本声明,并保持内容完整
楼主真棒 学习了

发表于 2020-8-16 12:04 |显示全部楼层
此文章由 gao.zhan 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 gao.zhan 所有!转贴必须注明作者、出处和本声明,并保持内容完整
山与风 发表于 2020-8-15 23:40
贴一份作业~~~~如果有同胞选到我这门专业,也行能给到一些参考。

Estimating Assessment Task

What's the answer for Question 6?
Thanks
Grand Building Consultants

发表于 2020-8-16 18:07 来自手机 |显示全部楼层
此文章由 墨尔本玩家 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 墨尔本玩家 所有!转贴必须注明作者、出处和本声明,并保持内容完整
请教下,在澳洲拿到masters 了,还能免费读这个课程吗?

新出的那个job maker会不会多一些免费课程选择?

发表于 2020-8-16 18:10 |显示全部楼层
此文章由 gao.zhan 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 gao.zhan 所有!转贴必须注明作者、出处和本声明,并保持内容完整
墨尔本玩家 发表于 2020-8-16 17:07
请教下,在澳洲拿到masters 了,还能免费读这个课程吗?

新出的那个job maker会不会多一些免费课程选择? ...

不符合条件
Grand Building Consultants

发表于 2020-8-16 22:22 |显示全部楼层
此文章由 NSW2019 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 NSW2019 所有!转贴必须注明作者、出处和本声明,并保持内容完整
山与风 发表于 2020-8-13 11:01
谢谢大叔,看了您的帖子!也请加油哦!实在不行疫情过后就来VIC~~。

要谢谢你的鼓励和传递的信息,很有用。找了一下,新州没有免费,但是政府也资助了不少,费用不到3000.为自己充电,这点儿费用还是值得。
Advertisement
Advertisement

发表于 2020-8-16 22:28 |显示全部楼层
此文章由 NSW2019 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 NSW2019 所有!转贴必须注明作者、出处和本声明,并保持内容完整
山与风 发表于 2020-8-13 15:46
申请加我好友的朋友们,我还是草鞋。要到布鞋才能加好友,所以很抱歉。请在一楼为我加分吧。谢谢!:handsha ...

尝试下,把你每次回复的长内容分几部分发出来,积分回增加很多。

发表于 2020-8-16 23:23 |显示全部楼层
此文章由 NSW2019 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 NSW2019 所有!转贴必须注明作者、出处和本声明,并保持内容完整
本帖最后由 NSW2019 于 2020-8-16 22:24 编辑
山与风 发表于 2020-8-13 11:06
其实我想说,您不缺现场工程经验,英语也很好。至少比绝大多数人好了太多太多。目前就差一个机会了。我觉 ...


谢谢你的肯定和建议。刚从边远地区转战到悉尼,房子,孩子入学都在这边弄妥了,再折腾到VIC代价有点儿大。新州应该有机会,应该是我还没有摸到门道。

发表于 2020-8-17 15:03 |显示全部楼层
此文章由 poplock 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 poplock 所有!转贴必须注明作者、出处和本声明,并保持内容完整
fasonfocus88 发表于 2020-8-11 21:34
楼主真棒!过几个月我也要开始学了    希望可以一起努力呀

你好,你是已经报名入学了吗?因为我也有打算开始学习,人在新州。
开心第一。

发表于 2020-8-17 15:36 |显示全部楼层
此文章由 123z456x789c 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 123z456x789c 所有!转贴必须注明作者、出处和本声明,并保持内容完整
楼主,我也是女生,在澳洲学了四年土木,然后发现你发的问题我都不知道答案

楼主加油,继续分享,一起学习