nunurosegarden 发表于 2014-2-14 09:58 
因为我们是upgrade to platinum package,所以已经包括很多,例如
ceiling square edge, wet area floor t ...
现在想到的Internal Colour upgrades..
1. Kitchen Benchtops – 40mm
2. Kitchen Island front face – 60mm or 70mm
3. Laundry/bathroom/Power room Benchtops – 20mm
4. Entry door to 1020mm or 1200mm / handle / locks / translucent glass
5. Bedroom doors upgrades / door frame / handle/ locks
6. Ask what locks are keyed-alike so you don’t end up with multiple keys to lock up doors
7. Consider installing a secure internal door from garage into house instead of lightweight non lockable standard door
8. Cornice
9. Gas Cooktop - 防熄火?
10. Microwave tower cupboard door (not lift up)
11. Kitchen cupboard gloss?
12. Install extra noggings / studs / trimmers for mounting heavy pictures, TV's, projectors, screens , curtain tracks / blinds
13. Can skirting boards be laid by builder after handover if organising own flooring installation?
14. Translucent window/ Frosted windows (power room)
15. Build-in upgrades / Delete all shelving for walk in robes and built in robes if sourcing own shelving after handover and ensure clothes rails aren’t installed as well
16. Bathroom accessories
17. Hanging rail under laundry overhead cupboards
18. See if you can make the staircase wider than normal for moving stuff upstairs
19. Double rebated entry door jambs. Double rebated door jambs allows you to fit a fly wire or security door without the need for costly modifications
20. Ducted rangehood – to outside, not roofs space?
21. Undermount sink with a draining board
22. Stairs
|
|