新足迹

 找回密码
 注册

精华好帖回顾

· 小安周末厨房之南乳板栗焖五花肉 (2009-5-9) aitingwang · (原创)从球场的角度去看墨尔本社会 (2011-8-9) gifox
· 和侦探们一起工作的日子 (2008-7-10) 飞儿 · The story of a young immigrant (so far) (2006-12-26) 黑山老妖
Advertisement
Advertisement
查看: 4196|回复: 2

[地区选择] 火车沿线房子可以靠rezone发财,那么轻轨的影响力呢? [复制链接]

发表于 2017-3-7 08:27 |显示全部楼层
此文章由 invalid 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 invalid 所有!转贴必须注明作者、出处和本声明,并保持内容完整
州政府三周前宣布了Parramatta Light Rail的stage 1 在2018年动工,2023年开通,列出了下面的几个站。大家来发表一下这个对沿线的房子有没有可能rezone?

The stage 1 route was announced on 17 February 2017. The stage 1 route runs between Westmead and Carlingford via North Parrramatta, the Parramatta CBD, Camellia, Rydalmere, Dundas and Telopea. A list of sixteen provisional stops was released for the twelve kilometre route. The stops are:[27]

Interactive map of stage 1
Westmead
Westmead Hospital
Children’s Hospital
Cumberland Hospital
Factory Street
Fennell Street
Prince Alfred Square
Eat Street
Parramatta Square
Harris Street
Tramway Avenue
Camellia
Rydalmere
Dundas
Telopea
Carlingford

Land has been purchased for a maintenance and stabling facility, to be located east of Rosehill Racecourse. Trams will access the facility via a short branch line that uses the alignment of the disused Sandown heavy rail line.[28][29]

Construction for Stage 1 is expected to begin in 2018 and be completed by 2023. Services are expected to operate every 7.5 minutes throughout the day.[30]
Advertisement
Advertisement

发表于 2017-3-7 17:50 来自手机 |显示全部楼层
此文章由 invalid 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 invalid 所有!转贴必须注明作者、出处和本声明,并保持内容完整
感觉轻轨可能要联通着火车大站或者CBD才能有价值?

发表于 2017-3-7 18:23 来自手机 |显示全部楼层
此文章由 zeter 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 zeter 所有!转贴必须注明作者、出处和本声明,并保持内容完整
又不连CBD,如果能连上CBD,那就牛了。

发表回复

您需要登录后才可以回帖 登录 | 注册

本版积分规则

Advertisement
Advertisement
返回顶部