|
|
此文章由 lmel 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 lmel 所有!转贴必须注明作者、出处和本声明,并保持内容完整
本帖最后由 lmel 于 2019-12-5 09:50 编辑
Demolition Works
Remove existing tiles from walls and floors
Remove Spa bath & old vanity/basin
Remove old shower cubicle
Repair walls
Fit new wet area plaster to bathroom
in preparation for new tiles
Carpentry
Fit new shower base to accommodate tiles
Repair floor where required
Construct niche in shoer area
Waterproofing
Waterproofing to floor and effected area's
Bath
fit new free standing bath to replace old
Bath type must accommodate weight restrictions to that area
Tiling
Wall tiles to ceiling Approximately 30 square metres
Floor tiles approximately 8 square metres
Grout wall and floor area's/ silicone corners shower area
All tiles Prime costed at $30m2
Fit vanity
Fit double vanity unit
Shower screen
Supply and fit glass panel approximately 1170 widthx2000 height,
we can make this a bit longer if you wish?
Tap ware
Fit Tap ware to bath,basins & shower
Miscellanies
Fit towel rails, soap holder, toilet roll holder, etc.
Electrical
All in one light fan & heater. And move 2 GPO's to appropriate position
Suppy anf fit 2 downlights
Plumbing
To related area's
Remove existing toilet and refit into downstair bathroom.
这是工作内容,西人builder. 这个卫生间是在楼上的 |
|