|
此文章由 kaku32 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 kaku32 所有!转贴必须注明作者、出处和本声明,并保持内容完整
亲爱的蕾蕾,老大卫,单衣纵酒帮忙看一下。真实找到地方了。我是想在澳洲找一份工作,或者其它有发展前景的,不知各位觉得如何?
kaku32
Great Street
Glenroy, VIC 3046
03-9******** (home)
0403******
*****@hotmail.com
OBJECTIVE: Electrical Design Engineer/Drafter position
EDUCATION: Master of Project Manage of University of Quebec at Outaous (September 2004 -on going)
Coursed taken included:
Basic Accounting Project Management,
Team work and organization Basic Commercial mathematics
Bachelor of Electrical Engineering, September 1992-July 1996
********* University, China
Courses taken included:
Circuits Automation
Power Systems Power Electronics
Electrical Machinery Magnetics
Analogical and Digital Electronics Protection Relaying
Telecommunication Extra High Voltage Seminar
Electrical Components of Thermal Power Plant
EXPERIENCE: Electrical Engineering, July 1996 to May 2002
Electric Power Design Institute, China
• Developed specifications for design products in terms of clients; preference, national electric code and standard, consumers’ investment, selection of materials, new technology, personnel and equipment security, marketing and business conditions.
• Modified the design of products according to users’ requirements.
• Designed control and protective system of feeder, transformer, all kinds of machinery, such as motors, valve, pump, fan, air conditioner; distributing system; lighting of industrial and residential buildings; measuring meters; cabling; lightning arresting system; fire prevention system; layout of bus, circuit breaker, switch, potential transformer, current transformer, wiring and so on.
• Produced technical drawings, schematic diagrams
• Co-ordinated and co-operated with clients and manufacturers for products and installations.
• Collected quality feedback information and solved on-site design problems.
From May 2002 to July 2007, I have lived in either Canada or China for learning, travel, some casual jobs.
Main Project achievements:
1.Yangzonghai Thermal Power Plant with capacity 2*200MW, in commercial operation
Detail design:
A. Secondary and control wiring diagram including control circuit and terminal panel of feeder line of power supply
B. Control and protective system of machines such as electrically operated valve, circulating water pump, feed-water pump, waste cleaning machine, fan, air conditions.
C. Sound and flash signal alarm circuit.
D. Installation diagram of water level indicating devices and interlocked circuit of water pump.
E. Lighting protections of packing machine house, control wiring diagram of packing machine
2. Qujin Thermal Power Plant with capacity: 2*300ME, in commercial operation,
Field engineer, supervised installation, solved problems of design:
A. Improved the lighting system of dry coal shed because of improper installation location of dust and water-proof lamps in roof of dry coal shed.
B. Coordinated with manufacturers to solve the negative result of unsuitable installation of control board in the main control centre.
3. 110KV Zhangguangying Substation, in commercial operation
A. Wiring diagram and terminal panel of 10KV line
B. Measuring meter panel of 10KV line
C. Schematic diagram of section breaker control circuit of 10KV line
D. Terminal panel of operating circuit and switch board of 10KV line
4. Xuanwei Thermal Power Plant with capacity: 2*300MW
Electrical Design Engineer:
A. Secondary and control wiring including control circuit, interlocked circuit, terminal panel, protective relaying circuit, sound and flash signal alarm system, measuring meters such as kilowatt-hour meter, ampere, voltmeter.
B. Lighting operation box, lighting equipment summary, lighting and wire lying diagram of auxiliary buildings
C. Cable lying, design of cable rack, calculating cable length, specifications of cable
5. Desulphurization Project of Xiaolongtan Thermal Power Plant with capacity: 6*100MW which is a technical renovation project for environmental protection
A. Terminal panel of electric precipitator system including high-voltage and low-voltage control board, electrically heated terminal panel of ash hopper, operated box of ash hopper, electromagnetic vibration box, control desk of main computer)
B. Control circuit of water cooling pump, water pump, fan, ash transfer motors, transformer of air compressor
C. Wiring diagram of current and voltage circuit
D. Terminal panel of 6 KV switch board of transformer and 380Vdistributing panel of air compressor
6. Reconstruction of Workshop in Yangzhonghai Thermal Power Plant
Chief design engineer
A. Low-voltage switch board for machines in workshop
B. lighting system of workshop and office buildings
C. Cable lying of workshop and office buildings.
7. Residential Building of repair factory of Yunnan Thermal Power Construction
A. Lighting system
B. Grounded layout of lightning Arrester of all buildings
8. Added Bay between 110KV Xiaoheishan substation and 110KV Pingyuanjie Substation
A. Layout of outdoors distributing equipment
B. Installation diagram of SF6 circuit breaker, switch, potential transformer and current transformer
C. Wiring diagram of 110KV feeder between Pingyuanjie line and Qiubei line
D. Control circuit of 110KV feeder between Pingyuanjie line and Qiubei line
E. Panel of Control circuit
9. Drainage Closure System Project of Xunjiansi Power Plant
A. Distributing system
B. Cabling
10.Translating technical package of excitation control system of Xuanwei Thermal Power plant (From English to Chinese)
Including specifications, technical documents of diagrams, liaison sheets
R-R Industrial Controls Ltd. provides this package of excitation control system.
Address: Kingsway, Team Valley Trading Estate, Tyne and Wear, England, NE110QJ
TEL: 0191487081
Computer:
• Advanced knowledge of AUTOCAD.
• Word, Excel and PowerPoint.
• Operating system: Windows NT, 2000, XP.
Referenc:
1. Senoir Engineer, Ms Yang **
tel: 86-***-*******
2. Senoior |
|