|
此文章由 虎妈 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 虎妈 所有!转贴必须注明作者、出处和本声明,并保持内容完整
Further to NSWNF 2010/065, the CBFCA has received advice from the Sydney Ports Corporation that Port Botany remains closed to shipping and that further port status reports will be provided during the course of the day. In the interim, below is an update on details that have been provided to the CBFCA :
PATRICK have advised that they have had several containers down in their yard due to last night's storms and have engaged salvage teams to get the yard back into working condition. Their terminal will be closed until at least 1300 today with slots from last night's midnight shift and day shift cancelled and needing to be rebooked. All imports have been given and extra day free storage and that the situation with exports is being reviewed
DP WORLD indicated that they have recommenced operations however previously booked slots will not be processed. DP World have advised the transport sectors to check 1-Stop availability for revised dates noting that APL Amazonite, Valerie Schulte, Wana Bhum, ANL Wyong will be given an extended last free day.
MCS BANKSMEADOW operations will be closed for the day.
MCS COOKS RIVER is closed until further notice.
从报关协会的最新消息,由于今天的天气情况,今天悉尼码头继续关闭。
Patrick码头昨晚的暴风雨吹倒已经码头的多个集装箱, 紧急救护队已经行动,使码头恢复工作状态。从昨天晚上到今天至少有1300个预订的提货时间被取消由于码头的关闭,现在需要重新登记。所有的进口商将会给予额外的一天仓储,出口货柜的状态也要重新更新。
DP world 码头已经开始操作,但昨晚的提货时间将不处理,需要重新登记。DPworld码头建议运输公司时刻注意1-shop的网站上货柜的修正的下船日期。对于APL Amazonite, Valerie Shulte, Wana Bhum, Anl Wyon船上的货柜给予多一天的免费时间。
MCS Banksmeadow今天关闭。
MSC Cooks River关闭,等进一步的通知。 |
评分
-
查看全部评分
|