今天收到building& inspection 的报告了 报告指出了一些问题 我就放重点的2个 现在的情况是:我已经交付了定金 也在过户师那里和中介签订了交付余下定金的日期和购买合同 看了报告后 有点希望房主能解决报告中指出的问题 不知道该如何和中介说 也不知道 如果我提出让房主修补或者降价的希望是否合法 看完报告后感觉房子油漆的问题还是比较大,{房子7年 单身人士租了6年 }诚心诚意请教论坛的朋友
报告 图片太大传不了 只好文字版了
厨房的
The tap in this area has not been installed correctly, or has deteriorated with age, and is consequently loose. This tap being loose creates potential for water leaks and subsequent water damage to the surrounding area.Where taps or spouts are loose, a qualified plumber should be appointed to re-fix the plumbing fitting.
Main Building
All Areas
Paint finish - Incomplete
The paint finish in this area was identified as being incomplete at the time of inspection.
Whilst incomplete or missing paint finish is generally an appearance defect, it can also lead to the development of secondary building defects over time. Incomplete areas of paint finish exposes the area to moisture, potentially accelerating the deterioration of underlying building materials.
Incomplete paint finishes should be sanded back, filled, levelled and painted, as applicable. Where inadequate or missing paint protection has led to the deterioration of the associated building element, repair and/or replacement of this building element may be required.
A painting contractor should be appointed as soon as possible to perform necessary works to aid the appearance of the affected area and to ensure the area is protected against further deterioration. Alternatively, the homeowner following manufacturer instructions may perform these works. |
|