原帖由 H妈妈 于 2010-11-9 19:03 发表   
 
 
啊?怎么那么贵啊?贴出来明细让论坛上的专家们看看吧!我记得你的地只是有个下水道问题,但是地本身还算是平整工整的呀!太贵了!是不是他们放了很多allowance进去,in case遇到石头?其实真的应该找其他builder再看看的,有些只收5 ...   
 
你大事干完了么? 
 
我们的地后高前低,所以要求了step down edge beam,前面看上去就是要上几格楼梯才到前门的,感觉漂亮些. 
 
明细如下: 
 
1. Basic site cots for a standard site (M class slab) 
$6900 
 
2. Provide Earthworks including: 
Vegetation scrape 
Importing of fill 
Exporting spoil from excavation including disposal fees 
exporting spoil from piering 
exporting spoil from drainage 
$7400 
 
3. Provide up to 60lm of bored concrete piers under the slab 
$5520 
 
4. Concrete pump 
@1100 
 
5.Additional Material Handling due to restricted access or excessive site fall, including small load deliveries, specialised scaffolding & double handling of materials 
$2000 
 
6. Dropped edge beams to be house as required by Local Authorities and site conditions including increase ceiling height to garage by 514mm and provide 2 internal steps 
$14850 
 
7.Retaining walls by owner 
(这个还没算钱我们自己干的活) 
 
8.Extend Underground power suppply over 9m run.  
$702 
 
9. Metal Service Pole at the boundary, connected to overhead supply on the same side of the road. 
$1650 
 
10. Provide additional run of 90mm stormwater line. 
$504 
 
11. Extend 100mm sewer line. 
$1044 
 
12. Near side (of road) water tapping and connection from mains to meter. 
$820 
 
13. Additional length of 20mm dia water service over 9m run.  
$312 
 
14. Provisional Allowance for footpath opening to connect to sewer and stormwater. 
$5000 
 
15. Provisional allowance for On Site Detention.  
$22000 
 
总共$69802 
 
然后BASIX: $10990. 
 
 