[其他] Anyone working as structure engineer [复制链接]

发表于 2009-3-17 16:45 |显示全部楼层
此文章由 xyliu925 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 xyliu925 所有!转贴必须注明作者、出处和本声明,并保持内容完整
I have a questioin:

If I want to drill a big hole, say 1200X200, next to the edge of a column 800x800. Is there any problem?

the hole will take a whole side of the column. leave other three sides untouched.

The building is 13 floors.

Thanks
Advertisement
Advertisement

发表于 2009-3-18 12:14 |显示全部楼层
此文章由 flinders16 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 flinders16 所有!转贴必须注明作者、出处和本声明,并保持内容完整
hard to comment, generally speaking opening not bigger than 500mm should be ok, your hole is a bit big, so i think the answer is probably "no" unless you locally strengthen slab.

发表于 2009-3-18 14:55 |显示全部楼层
此文章由 anthonyduan 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 anthonyduan 所有!转贴必须注明作者、出处和本声明,并保持内容完整
没明白楼主的意思, COLUMN底下应该是PADESTAL, 或者是SLAB+PILE SYSTEM, 你怎么挖?
如果没有碰到BEARING AREA, 应该没问题. 但是你如果要砍掉PADESTAL的一部分,这样一来BEARING AREA 减小了,土压力就增大了, 这样就需要做计算.有没有示意图?

发表于 2009-3-18 15:57 |显示全部楼层
此文章由 flinders16 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 flinders16 所有!转贴必须注明作者、出处和本声明,并保持内容完整
我猜他是要在楼板上开洞,不是基础。。

发表于 2009-3-18 21:55 |显示全部楼层
此文章由 Vxmon 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 Vxmon 所有!转贴必须注明作者、出处和本声明,并保持内容完整
那么大的柱,周围肯定很多钢筋的。

发表于 2009-3-19 12:54 |显示全部楼层
此文章由 tierracomi 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 tierracomi 所有!转贴必须注明作者、出处和本声明,并保持内容完整
structure engineer, 想起越狱4的打洞计划
Advertisement
Advertisement

发表于 2009-3-20 15:50 |显示全部楼层

Thanks all above