mingsh22 发表于 2020-9-27 13:12 
仔细看了一下。。。550的要求是WLEP 2012上的要求。可是DCP是可以overwrite WLEP的。DCP上清楚了写着是70 ...
多谢您的回复
但是这个700平是指建duplex要求,并不是分地的要求;(分地仍然是550)
所以即便是建好了duplex,仍然是一个title;
除非5年以后,如下LEP
4.1C Minimum subdivision lot size for dual occupancies
(1A) Despite any other provision of this Plan, development consent must not be granted to the subdivision of a lot on which there is a dual occupancy except in accordance with this clause.
(1B) Development consent may be granted to the subdivision of a lot on which there is a dual occupancy if the size of any lot resulting from the subdivision is not to be less than the minimum size shown on the Lot Size Map in relation to that lot.
(1) Development consent may also be granted to the subdivision of a lot on which there is a dual occupancy if:
(a) the lot is not a lot in the area identified as “Area 1” on the Dual Occupancy Restriction Map, and
(b) the area of each lot resulting from the subdivision is at least 350 square metres, and
(c) each of the resulting lots will have one of the dwellings on it, and
(d) the floor space ratio of each dwelling does not exceed:
(i) 0.4:1, or
(ii) any floor space ratio specified under clause 4.4A for a building on the lot,
whichever is the lesser, and
(e) a final occupation certificate was issued for the dual occupancy at least 5 years before the development consent is granted.
(2) (Repealed) |
|