准备修后院,加个vergola 6.6米乘4.5米, deck, 有些 pavement,再加 游泳池 ,6米乘3.5米 。 擦,昨天收到报价,加了GST, 15万 。顿时脸都绿了。 大家帮我看看吧

Item No.     Description Quantity                                                                        Unit                      Total $
1                Project Management & Site Establishment                                    1.00 Item             3,310.97
2                Excavation, site preparation, rubbish removal and materials        1.00 Item             11,780.47
                  handling as required to install new landscape work. Please
                  note: No allowance has been made to remove soil from site at
                  this stage and we will have to conduct a site visit to calculate
                  the quantity. No allowance has been made for excavation of
                  rock if required.
3               Supply and Installation of new 400mm sq drainage pit at edge       1.00 Item           520.65
                 of deck to catch patio surface water. Connect downpipe to pit
                 under deck as specified on plan.
4             Supply and Installation of Quality organic garden soil to a               51.85 M2            1,929.34
                depth of 100mm and organic mulch to a depth of 75mm to all
                garden areas as specified on plan. Includes slow release
                fertilizers.
5             Supply and Installation of Garden Edging as specified on               12.60 Lm            417.69
                plan.
6             Supply and Installation of quality plant material as shown on          1.00 Item            3,341.46
                drawing. Includes 1 initial watering
7             Supply and Installation of stepping stones laid on a sand and         4.00 Each           308.20
               cement bed as specified on plan. Please note: $10 per paver
               allowance.
8            Supply and Installation of new 450mm sq Boral Abode pavers        62.78 M2             15,788.54
              in 'Latte' to pool patio and new patio on a concrete sub base
              as specified on plan.
9            Supply and Installation of 450mm sq Boral Abode bullnose             17.50 Lm              3,964.98
              units to pool coping as specified on plan.
10          Supply and Installation of semi frameless glass pool fencing           23.10 Lm              7,887.73
              including 1 x gate so as to comply with Australian standards.
              using 10mm clear toughened glass (gate in 8mm) and heavy
              walled polished anodised 54mm diameter glazing posts.
11          Supply and Installation of 1.8m high treated pine timber paling         17.00 Lm              2,266.95
             fence with steel posts as specified on plan. Price does not
             include rock excavation if required.
12         Supply and installation of new Austral Heron wall in 'Charcoal'         5.92 M2               4,543.30
             to retain pool patio area. Retaining wall height to approx
             40mm high. Wall to be installed on a concrete footing.
13         Supply and installation of new Austral Heron wall in 'Charcoal'         17.76 M2             12,008.25
             to retain around new deck and patio area. Wall height 800mm
             off deck height as specified. Wall to be installed on a concrete
             footing. Price includes walls next to steps.
14        Supply and Installation of new Permadeck decking on a                    39.02 M2              13,960.97
            treated pine framework on a concrete sub base. Deck to be
            flush with internal garage floor level. 2.1m wide steps up to
            lawn area and to pool area as specified on plan
15        Supply and Installation of new three panel Vergola skillion                  34.06 M2              50,403.69
            roof over new alfresco at 7 degree pitch with fall back to
            house supported by 350mm sq columns to outside edge
           (Timber frame with painted tongue & groove cladding to faces
            painted in 'Antique White USA') Support inside edge with
            extenda brackets through house roof fixed to top wall plate.
            Vergola in 'Surfmist' Colour as specified on plan. Please note:
            Allowance of $68 per light fitting and Provisional sum of
           $1500 for electrician to run power to Vergola and to 5
           directional lights.
16       Replace existing garage door with new 3 pane powder coated           1.00 Item             4,769.67
           aluminium bi fold door. 2.4m wide x 2.05m high as specified
          on plan.
17      Home Warranty Insurance                                                                     1.00 Item             1,206.22

评分

参与人数 4积分 +12 收起 理由
高密公主 + 2 安慰一下
sydnewcomer + 5 感谢分享
突然的自我 + 3 感谢分享

查看全部评分

Advertisement
Advertisement

发表于 2016-12-9 19:31 |显示全部楼层
此文章由 cantonese 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 cantonese 所有!转贴必须注明作者、出处和本声明,并保持内容完整
日元?

发表于 2016-12-9 19:31 |显示全部楼层
此文章由 lesli1109 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 lesli1109 所有!转贴必须注明作者、出处和本声明,并保持内容完整
别的不知道,挖个新的游泳池7-8万应该是正常的。

发表于 2016-12-9 19:43 |显示全部楼层
此文章由 homesearch 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 homesearch 所有!转贴必须注明作者、出处和本声明,并保持内容完整
贵了

发表于 2016-12-9 19:47 来自手机 |显示全部楼层
此文章由 simplyjean 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 simplyjean 所有!转贴必须注明作者、出处和本声明,并保持内容完整
澳币,擦擦。。

发表于 2016-12-9 19:51 来自手机 |显示全部楼层
此文章由 simplyjean 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 simplyjean 所有!转贴必须注明作者、出处和本声明,并保持内容完整
lesli1109 发表于 2016-12-9 20:31
别的不知道,挖个新的游泳池7-8万应该是正常的。


这里还没有游泳池挖土的钱,说要再加三万。
Advertisement
Advertisement

发表于 2016-12-9 19:59 |显示全部楼层
此文章由 大成 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 大成 所有!转贴必须注明作者、出处和本声明,并保持内容完整
高大上的鬼佬公司是这样了,土豪不差钱的就上
头像被屏蔽

禁止发言

发表于 2016-12-9 20:00 来自手机 |显示全部楼层
此文章由 twp 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 twp 所有!转贴必须注明作者、出处和本声明,并保持内容完整
再加以后填游泳池还要一万

评分

参与人数 1积分 +2 收起 理由
clack + 2 :P 我很赞同

查看全部评分

头像被屏蔽

禁止发言

发表于 2016-12-9 20:04 来自手机 |显示全部楼层
此文章由 找回PIN 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 找回PIN 所有!转贴必须注明作者、出处和本声明,并保持内容完整
本帖最后由 找回PIN 于 2016-12-9 21:05 编辑

正常价,一个游泳池就要5万,一般人整不起。

发表于 2016-12-9 20:06 |显示全部楼层
此文章由 shawn-oz 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 shawn-oz 所有!转贴必须注明作者、出处和本声明,并保持内容完整
15w还不够呀,好些项目还要加allowance呢。真的好贵,比如有一项铺地砖的,市面上买材料价格是60刀一平米,报价是250刀一平米,铺地砖贵到如此程度

发表于 2016-12-9 20:06 来自手机 |显示全部楼层
此文章由 simplyjean 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 simplyjean 所有!转贴必须注明作者、出处和本声明,并保持内容完整
大成 发表于 2016-12-9 20:59
高大上的鬼佬公司是这样了,土豪不差钱的就上

不是土豪。。。
Advertisement
Advertisement

发表于 2016-12-9 20:16 来自手机 |显示全部楼层
此文章由 hermigervil 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 hermigervil 所有!转贴必须注明作者、出处和本声明,并保持内容完整
以后挖泳池看来也要自己来了,心累

发表于 2016-12-9 20:24 来自手机 |显示全部楼层
此文章由 simplyjean 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 simplyjean 所有!转贴必须注明作者、出处和本声明,并保持内容完整
hermigervil 发表于 2016-12-9 21:16
以后挖泳池看来也要自己来了,心累

自己挖啊。。。

发表于 2016-12-9 20:29 来自手机 |显示全部楼层
此文章由 hermigervil 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 hermigervil 所有!转贴必须注明作者、出处和本声明,并保持内容完整
simplyjean 发表于 2016-12-9 21:24
自己挖啊。。。

挖呗,省好几万呢

发表于 2016-12-9 20:32 |显示全部楼层
此文章由 simplyjean 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 simplyjean 所有!转贴必须注明作者、出处和本声明,并保持内容完整